- Dredging works (dredging of the loose sand and silt material and cart away to the dumping area).
- Construction of the Main and secondary breakwater from level -3.50MSL to -9.00MSL (using rocks from 0.5 to 5 tons & ACCROPODE 5 & 6.3m3).
- Construction of the concrete quay walls at depth of -4.30MSL & -5.3MSL to top level +0.50 MSL.
- Execution of concrete crown wall at +8.00 MSL and copes at +1.50 MSL.
- Execution of the infrastructure for the Marina.
- Execution of the refreshing sea water box culverts.
Start: May 2022
End: July 2025