Check Out

Overview

  • Urban furniture such as decorative poles, rubbish bins, concrete benches and bollards
  • Main sewerage line diameter 200mm and house connections
  • Stormwater network and gully connections
  • Medium voltage, Low voltage and street lighting
  • Water supply and irrigation
  • Telecommunication network
  • Road works such as asphalt, sidewalks, road marking, Cycling Lane

Start: October 21, 2024

End: Ongoing